4 Replies to “Municipal Project #2: Dry Bridge Replacement – West Lebanon, New Hampshire 8/8/26”

  1. Great as usual. Do you know if there is going to be a temporary bridge while the new one is being installed?

    1. Thanks Clyde. The plans as announced are for a detour and no temporary bridge. The detour would be via Glen Rd., so not really that bad I think.

      1. The intersection at glen rd and rt 4 definitely will need a temporary stop light. Last time so main was shut down, it was a nightmare at that intersection

        1. Gwen, I think you are right. That slope and entry angle will be bad, especially with the extra traffic and folks that aren’t used to it.

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!